New home handover inspection — check everything before the final payment

A complete quality audit of your newly built house before you accept it from your contractor or builder, with a prioritised snag list.

Quick answer

What should be checked before taking handover of a new house?

Check finishes, waterproofing, electrical, plumbing, doors and windows. RennovEN Ensure audits the new house and gives you a snag list before final payment.

The final payment is your strongest leverage with a contractor. Once it’s paid, getting defects fixed becomes much harder.

RennovEN Ensure audits the finished house room by room before handover, and gives you a snag list to close before you pay and move in.

Signs you need this

  • Your contractor says the house is ready
  • Final payment is due
  • You want an expert to check finishing
  • You have no snag list yet

The RennovEN promise

  • 10-year warranty on complete construction & renovation
  • Itemised pricing, approved before work begins
  • One accountable team across every trade
  • Residential specialists — homes only
Start My Build with Ensure

Priced by constructed area · Quote first

WhatsApp us

Diagnosis

Why it happens

Rushed finishing

Last-stage work is often hurried to close the project.

Untested systems

Waterproofing, drainage and circuits not tested before handover.

Small defects add up

Dozens of small issues are easier to fix before move-in.

Our method

How RennovEN does it

  1. 1

    Inspect

    Room-by-room checklist audit.

  2. 2

    Test

    Water flow, drainage, electrical points and moisture checks.

  3. 3

    Snag list

    Issues ranked with photos.

  4. 4

    Re-inspect

    Verify the contractor’s fixes.

What’s included

  • Room-by-room checklist audit
  • Bathroom and terrace flood tests where possible
  • Electrical point and safety checks
  • Prioritised snag list with photos
  • One re-inspection of fixes

What affects the cost

  • Built-up area and number of floors
  • Number of inspection stages or visits
  • Project location and travel
  • Report depth and frequency

Every home is different, so we don’t publish rate cards. Ask for a free quote and you get an itemised estimate; you approve every line before work begins.

Get a free quote

Workmanship warranty

RennovEN Ensure is an advisory service; your contractor stays responsible for the work. If you later engage RennovEN to rectify or complete works, those works carry our written workmanship warranty.

The warranty period is stated in your quotation. Done as part of a complete RennovEN construction or renovation project, it is covered by our 10-year warranty.

How our warranty works

FAQ

New Home Handover Inspection: your questions

New Home Handover Inspection in Lucknow

Currently onboarding on the RennovEN Train in Lucknow · Next station: Kanpur.

Localities we serve in Lucknow

Ready to find out what your home really needs?

Start with a free, itemised quote. No guesswork, no obligation.

Start My Build with Ensure

Priced by constructed area · Quote first

WhatsApp us
Start My Build with Ensure