RennovEN™

RennovEN Ensure guide

Construction supervision cost: how pricing by area works

RennovEN Ensure is priced per square foot of the area you build, so the fee scales with your house, not with how often you call us.

Quick answer

How much does construction supervision cost?

RennovEN Ensure is priced per sq ft of total constructed area: the built-up area of every floor, including the stair cabin and covered balconies, but not open terraces. The rate depends on the plan (Essential or Complete) and the stage you start from. We confirm the fee in a quotation before you pay.

Counted in total constructed area

  • Built-up area of every floor, including the walls
  • Stair cabin and mumty
  • Covered balconies and verandahs
  • Basement or stilt floor, if built

Not counted

  • Open terraces and open-to-sky areas
  • Boundary walls and open parking

What changes the fee

Total constructed area

The main driver. The fee is a rate per sq ft of the area of all floors.

The plan

Essential covers the critical stages only; Complete covers every stage, materials and bills.

Where you start

Starting mid-way removes the stages already finished from the scope.

Number of floors and slabs

Every slab is a pour we check before and during. More floors, more pours.

Your quotation states the fee and the payment schedule. Material lab tests, if you want them, are arranged through accredited laboratories at actual cost.

Plans

Ensure Essential

The stages that get buried for good.

You or a trusted site supervisor are on site often, and you want an engineer at the moments that can’t be undone.

6 inspected stages

  • Footings, every column and every slab checked before the pour
  • Concealed plumbing and electrical checked before plaster
  • 48-hour waterproofing ponding test witnessed
  • Photo report after every visit
  • Handover audit with Home Health Score

Price on request

Priced per sq ft of total constructed area

Get a quote for Essential
Most chosen

Ensure Complete

Every stage, every material, every bill.

You can’t be on site, you live away or abroad, or you simply want nothing left to chance.

14 inspected stages

  • Everything in Essential
  • Drawings, BOQ and contract review before work starts
  • Every stage from setting out to finishing
  • Material brand and grade checks against your contract
  • Contractor bills checked against the BOQ before you pay
  • Progress reports and a project log, with video for NRI owners

Price on request

Priced per sq ft of total constructed area

Get a quote for Complete

Total constructed area is the built-up area of every floor, including the stair cabin and covered balconies; open terraces are not counted. How Ensure pricing works

Is supervision worth the cost?

Supervision costs a small part of the construction budget, and it is the only way to check steel, cover, concealed services and waterproofing before they are buried for good.

Are re-visits for corrections charged?

Re-checking corrections before work moves on is part of every stage visit. Extra visits you ask for beyond your plan are quoted separately.

What happens after handover?

We watched your home go up, stage by stage, and audited it at handover. So when you enrol in RennovEN Secure within 6 months of your Ensure handover audit, there is no joining inspection: your Ensure records are the baseline. About RennovEN Secure

Get an engineer on your side before the next pour

Stage-by-stage checks, photo reports, a scored handover audit, and RennovEN Secure with no inspection.

Start My Build with Ensure

Priced by constructed area · Quote first

WhatsApp us

Ready to find out what your home really needs?

Start with a free, itemised quote. No guesswork, no obligation.

Start My Build with Ensure

Priced by constructed area · Quote first

WhatsApp us
Start My Build with Ensure