RennovEN Certified guide
New flat problems in the first year, and how to stop them before they start
Almost every repair new owners pay for in year one was already there on handover day. Here is what goes wrong, when it shows up, and how we catch it first.
Quick answer
What problems do new flats have in the first year?
The most common are damp on walls shared with toilets, water coming through window frames, balcony and toilet floors that pond, hollow tiles that crack, missing earthing, and distribution boards that overheat under summer AC load. Nearly all of them exist on handover day and can be found before possession with moisture, thermal, electrical and tap tests.
The cause-and-effect picture
Six families of hidden defects feed nearly every year-one repair bill.
- · Toilet waterproofing
- · Floor slope
- · Upper-floor leak
- · No earthing
- · DB hot spots
- · RCCB not tripping
- · Hollow tiles
- · Wide cracks
- · Open grout
- · Frame gaps
- · Doors rubbing
- · Poor seals
- · Sink leaks
- · Low pressure
- · Concealed joints
- · Area shortfall
- · No OC
- · Wrong meter
Ten defects to catch before possession
For each one: what is hidden on handover day, what you will notice later, when, and the test that finds it now.
Hidden at handover
Toilet waterproofing gaps or a badly set floor trap
What you notice later
Damp patch and peeling paint on the bedroom wall shared with the toilet; stain on the ceiling of the flat below
If found after possession: Break out tiles, redo the waterproofing, re-tile and repaint, plus the neighbour’s ceiling
Hidden at handover
Wrong floor slope in the toilet or balcony
What you notice later
Standing water, seepage under door sills, slippery floors and mould
If found after possession: Relaying the floor to a new slope, which means the room is out of use
Hidden at handover
Hollow tiles with poor bedding underneath
What you notice later
Tiles crack or lift, grout breaks, edges chip
If found after possession: Matching tiles are often discontinued, so a patch repair becomes a whole room
Hidden at handover
Missing or poor earthing
What you notice later
Shocks from appliances, damaged electronics, rejected appliance warranty claims
If found after possession: Rewiring earth runs through finished walls, and the risk to people is the real cost
Hidden at handover
Loose or undersized connections in the distribution board
What you notice later
MCBs tripping, burnt terminals, fire risk
If found after possession: Emergency electrician call-outs and damaged appliances, or worse
Hidden at handover
Window and sliding-door frames not sealed
What you notice later
Rain seeping in, damp under windows, dust, higher AC bills
If found after possession: Resealing from outside often needs scaffolding or rope access on a high floor
Hidden at handover
Wide or diagonal cracks in walls
What you notice later
Cracks widen and come back through every repaint; can indicate movement
If found after possession: Structural investigation and repair instead of a builder fix before possession
Hidden at handover
Weeping joints under the kitchen sink and in concealed pipes
What you notice later
Swollen cabinet boards, mould and pests behind the kitchen
If found after possession: Replacing kitchen carcasses you have just paid for
Hidden at handover
Carpet area short of the agreement
What you notice later
You paid for area you didn’t receive
If found after possession: A legal claim instead of a correction at handover
Hidden at handover
Leak from the flat above, hidden by the false ceiling
What you notice later
Stains, sagging panels, electrical faults in ceiling lights
If found after possession: A dispute with a neighbour instead of a builder fix
When each problem shows up
Moving in
- · Doors rub, locks are stiff
- · Dead switches and sockets
- · Dripping taps, weak flow
- · Missing keys
Settling in
- · Leaks under the kitchen sink
- · AC points without a core-cut or drain
- · Grout washing out of toilet floors
- · Exhaust fans too weak to clear moisture
Water finds every gap
- · Damp on walls shared with toilets
- · Rain through window frames
- · Balcony water running into rooms
- · Ceiling stains from the flat above
Electrical load peaks
- · MCBs tripping with ACs on
- · Hot or burnt terminals in the DB
- · Thermal cracks in plaster
- · Hot rooms from unsealed windows
Hidden defects surface
- · Hollow tiles crack or lift
- · Plaster cracks reopen after repainting
- · Door frames swell
- · Termite trails at frame bases
Your rights, and why evidence matters
Who pays to fix defects in a new flat after possession?
Under Section 14(3) of the RERA Act, 2016, the builder must fix structural defects and defects in workmanship, quality or services reported within 5 years of possession, within 30 days and at no charge. In practice, dated photo evidence makes the claim far easier to enforce.
Why does my new flat have damp walls?
Most often the waterproofing of an adjoining toilet or the window frame seal has failed. It is invisible behind fresh paint on handover day but shows on a moisture meter and thermal camera.
I already have the keys. Is it too late?
No. An inspection now still gives you a dated, tagged report to send to the builder within the defect-liability period, and a plan to fix the rest.
General information, not legal advice. For a dispute, consult a lawyer or your state RERA authority.
Get your new home checked before you take the keys
One visit, a Home Health Score, a builder-ready issue log and a re-visit to verify the fixes.
Price by home size · Re-visit included